What Are Submittals in Construction?

Article #97

Introduction

Construction submittals involve delivering documentation, drawings, samples, and other relevant material to the project’s design team, construction team, and stakeholders for approval. These submittals detail the project’s materials, equipment, and methods. Construction projects depend on submittal quality. They help the design team, contractors, subcontractors, suppliers, and regulatory agencies communicate, coordinate, and collaborate. Submission allows verification of compliance with project specifications, designer intent, and relevant codes and regulations. They also allow project materials, equipment, and systems to be evaluated for quality, appropriateness, and operation. Proper management and fast submittal approval are essential to avoid delays, reduce errors, maintain project quality, and help the construction project succeed.

Purpose of Submittals

Ensuring compliance with project specifications and requirements:

Submittals prove that suggested materials, equipment, and systems satisfy project requirements and comply with relevant rules, standards, and regulations. They let the design team and project stakeholders to carefully study and assess proposed products to ensure they meet project specifications, design criteria, and performance objectives. By thoroughly reviewing submittals, significant discrepancies or non-compliant items can be found and remedied before construction begins, eliminating costly rework or revisions.

Facilitating communication and coordination between stakeholders:

Submittals let construction stakeholders communicate and coordinate. They facilitate communication between the design team, contractors, subcontractors, suppliers, and regulatory agencies. Submittals allow project participants to ask questions and discuss proposed materials or equipment, facilitating collaboration and alignment. This ensures that everyone understands the project requirements, preventing misunderstandings, disagreements, and delays.

Verifying the quality and suitability of materials and equipment:

Submittals allow construction project materials, equipment, and systems to be assessed for quality, appropriateness, and functionality. Submittals let the design team and project stakeholders evaluate proposed items’ conformity with industry standards, performance specifications, and project expectations by providing extensive documentation, drawings, samples, and technical data. This verification procedure ensures that the chosen materials and equipment meet the project’s performance, durability, and needs. Examining submittals early on helps avoid utilizing unsuitable or inferior materials or equipment during construction.

Types of Submittals

Material submittals

In the construction industry, “material submittals” are the paperwork and samples offered up by suppliers, manufacturers, and contractors to prove the quality and suitability of the materials they want to utilize. Material submittals inform the design team and project stakeholders on the materials’ specifications, quality standards, and performance. Structural components, finishes, M&E equipment, plumbing fittings, and speciality items must be submitted.

For each material, the contractor or supplier gathers product data sheets, manufacturer’s requirements, test results, and samples. The design team or designated party reviews and approves these submittals. The design team—architects, engineers, and others—assesses the submittals against the project’s specifications, performance criteria, and quality standards. They ensure the proposed materials meet codes, regulations, and project requirements. The design team discusses submission issues with the contractor or supplier.

The design team approves submittals that meet all criteria after reviewing them. Before approval, changes may be requested. The contractor or supplier must offer alternatives if the submittals are refused. The project team can access and record accepted submittals in a submittal log or database.

Shop Drawings

Shop drawings are detailed and dimensioned drawings made by contractors, subcontractors, or fabricators that show the construction project’s components, assemblies, and systems. Shop drawings show how the design will be built, including details, measurements, and installation needs. Structural elements, architectural components, mechanical systems, electrical systems, and specialty systems require shop drawings.

The contractor, subcontractor, or fabricator creates shop drawings from design documentation and specifications. The design team reviews and approves these drawings and related documentation. The design team—architects, engineers, and others—checks the shop drawings to make sure they match the design intent, satisfy project objectives, and comply with regulations and standards. They check drawings for dimensions, collaboration with other trades, and standards. The design team resolves shop drawing issues with the contractor or subcontractor.

Product Data Submittals

Product data submittals include precise information, specifications, and documentation about construction project products and materials. Product data submittals give the design team and project stakeholders detailed information on proposed goods to evaluate and verify their compliance with project requirements, performance standards, and quality criteria. Submittable product data includes, Materials, equipment, fixtures, specialized systems, and components

For proposed products, the contractor, supplier, or manufacturer gives technical specifications, performance data, installation instructions, test reports, and warranties. The design team and project stakeholders evaluate product data to see if suggested goods meet project requirements, performance standards, and quality criteria. They consider product specs, performance, durability, sustainability, and project compatibility.

The design team ensures suggested items meet codes, rules, and industry standards. They may also check if the products meet the project’s aesthetic, functional, and design goals. The design team contacts the contractor, supplier, or manufacturer to resolve product data issues. This may involve obtaining more information or clarifying product details.

The design team approves product data after reviewing it. Before approval, changes may be requested. Product data that doesn’t meet project standards may be rejected and reworked. A submittal log or database records authorized product data, modifications, and clarifications. This guarantees the project team can access and capture the data.

Samples

Samples are tangible representations or specimens of materials, finishes, or products submitted for examination and evaluation during the construction project. Sample submittals give the design team and project stakeholders a chance to see and evaluate suggested materials, finishes, and products. Floors, walls, fabrics, upholstery, specialist finishes, and unique pieces require sample submission.

The contractor or supplier gives tangible samples of proposed materials, finishes, or goods. Documentation and specs accompany these samples. The design team and project stakeholders analyze sample appearance, quality, texture, color, and other qualities. They evaluate whether the samples meet the project’s aesthetic, performance, and design goals. The design team discusses sample issues with the contractor or supplier. This may require further samples or information about the suggested materials.

The design team confirms samples that meet project requirements after reviewing them. Before approval, changes may be requested. Samples that don’t satisfy project standards may be discarded and replaced. A submittal log or database tracks approved samples, modifications, and clarifications. This guarantees the project team can access and capture the data.

Submittal Procedures

Documentation requirements:

Each submittal should include a number, date, and title. Each submittal should have a cover page with the project name, submittal number, date, and a summary of the contents. Track and log all submittals, including status, dates, and comments or actions.

Required information in submittal packages:

A formal letter or document that introduces and summarizes the submittal package, including purpose, scope, and specific instructions or requests. A timeline for project submittals to ensure timely coordination and evaluation. To give the submittal context, include plans, elevations, sections, details, and specifications. A standard form that records the submittal number, description, date, responsible party, and review/approval status. To verify facts, include computations, test reports, certificates, product data sheets, warranties, and manufacturer’s instructions.

Format and organization of submittal documents:

Organize submittal papers in a clear, logical, and concise manner for simple review. For uniformity and reference, format all submittal papers using standardized templates or forms. To simplify cross-referencing, number all pages of the submittal package, including drawings, specifications, and supporting papers. To show linkages between drawings and specifications, include unambiguous references and annotations in submittal documents. Use electronic tools to simplify submission distribution, tracking, and team collaboration.

Submission and review process

Timelines and deadlines for submittals:

At the start of the project, create a detailed submittal plan with expected submission dates. The project timetable and this schedule should allow for evaluation and coordination. Keep submittals on schedule. Timelines allow project progress and timely evaluation and approval.

Roles and responsibilities of stakeholders in the review process

Architects and engineers check submittals for design intent, specifications, and industry standards. They evaluate construction, technical elements, and project coordination. Construction managers coordinate and facilitate submission review. They timely submittals, distribute them to stakeholders, and track review status. The project manager ensures the submittal process meets schedule and criteria. They resolve review issues with design professionals, the construction manager, and other stakeholders. The general contractor manages construction submittals. They interact with the design team to resolve differences in subcontractor and supplier submittals. Subcontractors and suppliers submit trade-specific submittals. They examine submittals with the general contractor and design team to ensure project compliance.

Communication and coordination during the submittal review:

Track submittal status and progress in a log or database. All review stakeholders refer to this log. Facilitate stakeholder communication during submittal review. This may include regular meetings, conference calls, or emails to monitor progress, handle concerns, and provide updates. Stakeholders should collaborate to resolve discrepancies, queries, and clarifications during the review process. This may require additional information, meetings, or submittal modifications. Designers critique submittals. The general contractor or subcontractor responds to these remarks with revisions, explanations, or further documentation. The submittal can be authorized after all edits and clarifications are made. If changes are needed, the submittal may be resubmitted.

Submittal tracking and documentation

Methods for tracking and managing submittals:

Track project submittals in a central register or log. This record should include the submissions number, date, responsible party, review status, comments, and actions. Use submission management software. These solutions automate tracking, notifications, and document version control, simplifying submittal tracking. Manage submittals with custom Excel spreadsheets or databases. These make submittal information sorting, filtering, and reporting straightforward and can be modified for the project. Use submittal tracking software to store, track, and manage submittals, review comments, and approvals.

Documenting approvals, rejections, and revisions:

Record approved submittals, including date, approving party, and conditions or qualifications. This documentation proves project compliance throughout construction. Document rejections, reasons for rejection, and required modifications or resubmissions. This paperwork tracks submittal review progress and ensures corrections. If a submittal requires adjustments, document the changes. This documents the review and modification process and ensures that stakeholders have the latest information. Keep emails, meeting minutes, and other submittal-related correspondence. This paperwork tracks submittal choices, conversations, and conflicts. To guarantee consistency and responsibility throughout the submittal process, documenting approvals, rejections, and amendments must be clearly communicated. The submittal tracking and documentation approach should match project needs and communication and document management rules.

Approval and Rejection of Submittals

Criteria for approving or rejecting submittals:

Track project submittals in a central register or log. This record should include the submissions number, date, responsible party, review status, comments, and actions. Use submission management software. These solutions automate tracking, notifications, and document version control, simplifying submittal tracking. Manage submittals with custom Excel spreadsheets or databases. These make submittal information sorting, filtering, and reporting straightforward and can be modified for the project. Use submittal tracking software to store, track, and manage submittals, review comments, and approvals.

Resubmittal process for rejected or revised submittals:

Record approved submittals, including date, approving party, and conditions or qualifications. This documentation proves project compliance throughout construction. Document rejections, reasons for rejection, and required modifications or resubmissions. This paperwork tracks submittal review progress and ensures corrections. If a submittal requires adjustments, document the changes. This documents the review and modification process and ensures that stakeholders have the latest information. Keep emails, meeting minutes, and other submittal-related correspondence. This paperwork tracks submittal choices, conversations, and conflicts. To guarantee consistency and responsibility throughout the submittal process, documenting approvals, rejections, and amendments must be clearly communicated. The submittal tracking and documentation approach should match project needs and communication and document management rules.

Common Challenges in Submittal Management

Construction projects can be difficult to manage submittals. To guarantee a smooth and quick submittal process, be aware of these problems and proactively address them. Uncertain or incomplete submittal requirements can cause delays. Well-defined submittal standards that specify information, format, and submission deadlines for distinct sorts of submittals are essential. Submittal management requires good communication and coordination between the design team, contractors, subcontractors, and suppliers. Delays, misunderstandings, and miscommunication can result from poor communication.

To stay on track, review and approve submittals quickly. Overloaded review teams, conflicting priorities, and resource shortages can delay reviews. Delays can delay projects and increase costs. Tracking and managing submittals requires thorough documentation. Insufficient paperwork, such as missing approvals, amendments, or rejections, can cause confusion, disagreements, and problems archiving project documentation. Subcontractors and suppliers of specialized materials and equipment commonly coordinate submittals. Subcontractor submittal quality, coordination, and delays might affect submittal management.

Submittals may require design discipline cooperation and extensive technical details. Conflicting drawings or specifications can cause rework, delays, and higher project costs. Changes to design documents or project requirements during construction can affect approved submittals. Managing these adjustments and ensuring that amended submittals meet project criteria is difficult. Electronic submission management systems and platforms may require system compatibility, training, and data protection and confidentiality. These issues demand proactive project management, excellent communication, defined protocols, and teamwork. Monitoring and reviewing the submittal process can assist discover and resolve project difficulties and bottlenecks.

Best practices for efficient submittal processes

Best practices for clear communication, good coordination, proactive planning, and technology utilization are needed to streamline construction project submittals. These tips can streamline submittals:

Clear communication and coordination among project team members:

Clear submission management communication and responsibilities. Discuss submittal requirements, timeframes, and revisions at project team meetings. To resolve submittal issues, maintain open communication lines.

Proactive planning and scheduling of submittals:

At project start, create a detailed submittal plan with deadlines and dependencies. Coordinate with designers, subcontractors, and suppliers to submit submittals on schedule. Consider delays and obstacles when planning the submittal.

Utilizing technology for streamlined submittal tracking and documentation:

Use software to automate and consolidate submission management. Digital platforms enable project team collaboration, document exchange, and real-time updates. Keep submittals, approvals, rejections, and adjustments in one place for convenient access.

Establishing standardized submittal procedures and templates:

Develop standardized submittal protocols that clearly explain the submission requirements, format, and review process for various submittals. Standardize submittal templates or forms for consistent documentation and information gathering. Guide project team members through submissions procedures and package completion.

Implementing a proactive review and approval process:

Make sure review teams have the competence and time to review and approve submittals. Inform stakeholders of review timelines and expectations. Standardized review checklists, unambiguous feedback, and fast responses streamline the review process.

Conducting regular progress reviews and audits:

Periodically evaluate submittal status, identify bottlenecks, and take corrective action. Regularly audit the submitting process for compliance and improvement. These best practices can improve submittal processes for construction projects, improving coordination, reducing delays, and increasing project success.

Conclusion

In conclusion, submittals help construction projects comply with specifications, improve stakeholder communication and coordination, and verify material and equipment quality and applicability. An effective submittal management system is essential to project success and quality assurance during construction. Proper submittal protocols, clear communication channels, and technology for tracking and documentation can reduce delays, improve team cooperation, and increase project success. Use technology using these steps. Prioritizing submittals and following best practices cannot be overstated. These characteristics aid construction project execution, completion, and quality.